Project: Construction of new High Voltage Line -500 kV

Date: 2013-2015 Year

Location: Rostov Nuclear Power Plant – Tikhoretskaya №2

Length of Line: 360 km

Construction Contractor: JSC Stroytransgaz

Work equipment: BKM-2012 (on Truck Chassis) and BKM-2032 (on crawler Chassis) 

Drilling characteristics: Mobile Piling Rig BKM-2012  drilled the wells with auger of large diameter,

then pick up the casing steel pile of diameter 720 mm and install it without any truck crane, and finally rotated the top of the steel pile in the ground 2 meter additionally. Mobility of piling rig on Truck Chassis allows you to travel long distances off road.

On the picture: Installation of casing steel pile as foundation for electricity tower with piling rig on Truck Chassis BKM-2012.